FC & KT - Install Guide

The FC & KT are compact in-ground solutions for locations inground, especially in concrete, deck, or patio applications.

The Drive-Over rating can be referenced in the chart below.

Fixture Drive-Over Rating
FC-GW 1,125 lbs
KT 4,400 lbs

 

FC Drill Guide

INSTALLATION STEPS

1

Change beam angle LENS and color FILTER by removing and replacing existing components (optional).

2

Dig a hole and insert the construction SLEEVE. Use drainage material below the sleeve. Fill soil or concrete on top of sleeve cover (if applicable).

3

Use a VOLTMETER to ensure 11-15 VAC at the fixture.

4

Connect wiring with a WATERPROOF CONNECTOR. Learn more

5

Install tamper-resistant SCREWS (optional).

 

6

Replace FACEPLATE and SCREWS.

 

FC Drill Guide

 