CP, LM, UN, PD - Install Notes

1

Run the wiring through construction SLEEVE. Install sleeve with cover into the wall during construction.

2

Remove installation COVER.

3

Use a VOLTMETER to ensure 11 to 15 V at the fixture.

4

Connect wiring with a WATERPROOF CONNECTOR. Learn more

5

Slide fixture into SLEEVE, level, and fasten screws.

6

Attach FACEPLATE and secure with screws.

Still need help? We're here.

Tell us what you need support with and we'll find the best solution for you.

Contact Support