- Install transformer(s) in a well-ventilated area away from direct irrigation spray and central to the proposed installation site.
- Mark the position of the top of the keyhole slot and the slot located at the bottom.
- If mounting to a solid surface, drill 1/8" diameter pilot holes at the positions marked in step two. Drive screws approximately halfway into the holes. • If mounting to drywall, drill 1/4" diameter holes at the positions marked in step two. Push plastic anchors into the holes and tap until flush. Drive screws approximately halfway into the plastic anchors.
- Slip the large portion of the keyhole over the screw and allow the transformer to slide down, making sure the bottom slot is behind the head of the bottom screw.
- Tighten screws until the transformer is secure.
- Split 12/2, 10/2, or 8/2 cable approximately 3" (80 mm), and strip 1/2" insulation from each wire.
- On the terminal block marked “COM,” push one bare wire into the hole and tighten the corresponding screw on the terminal block face until the wire is secure.
- Insert the remaining bare wire into the terminal block marked “COM, 11V, 12V, 13V, 14V, 15V” and tighten the corresponding screw on the terminal block until the wire is secure.
- If using a plug-in timer, plug the timer into the 120 V accessory receptacle. Plug the short power cord into the timer. Set the timer according to the instructions provided with the timer. If not using a plug-in timer, plug the short power cord into the 120 V accessory receptacle.
| PX Model | Ouput Terminals |
|---|---|
| PX-150 | COM, COM, 12V, 15V, 15V |
| PX-300 | COM, 11, 12V, 13V, 14V |
| PX-600 | COM, COM, 11V, 12V, 13V, 14V |
| PX-900 | COM, COM, COM, 12V, 13V, 14V |
Still need help? We're here.
Tell us what you need support with and we'll find the best solution for you.